Episode 18

Getting the Sequoia SEMA Ready! Armor, Wrap, and Rooftop Tent

The name is revealed in Part 2 of the Sequoia build along with a list of upgrades as the team works to get this build ready for the SEMA Auto Show! First, Tanner's DIY skills come in handy as he utilizes the bottle jack mounting space in the rear for a custom electrical solution.

Next up, the Sequoia gets a new look as the wrap goes on at SCS Wraps in Bozeman. After leaving SCS, a roadtrip down to Idaho Falls makes the installs of the CBI and Prinsu a breeze.

It's all hands on deck for this one to get out of the door in time, right up to the last possible second!

FIRST AIRED ON